Change Order App for Electricians
"While you're here, can you add an outlet by the bed?" It takes five seconds to ask and an hour to install. If nobody writes it down, it turns into an argument when the bill shows up.
Wiring Atlas puts each change in writing, on the same plan and job your customer already approved.
No card needed, and a practice job on a demo garage lets you try every step first. See pricing
How it works
-
Step 1: Set the scope
Write down what's included and what's left out, before anyone picks up a drill.
-
Step 2: Get the plan signed
Print an approval report that shows the work and where each item goes, for the customer to sign.
-
Step 3: Log each change
Add what's changing, its price, and its effect on the schedule. Mark it proposed, approved, or declined.
-
Step 4: Record the decision
An approved or declined change needs a date, a name, and a reference, so it's never just your word.
Why small changes start big fights
Changes are where jobs go sideways. In 2020, owner-directed changes were the second most common cause of construction disputes in Arcadis's yearly study.
A written change with a price and a name on it gives you and your customer the same story to point to.
Customers only sign for what they agreed to
Each report lists the scope, the exclusions, and the approved changes. Proposed and declined changes stay off the signature page, so nobody signs for work they turned down.
Every report has its own ID and is tied to one saved version of the job and the plan. Edit the job later, and the old report stays exactly as printed.
Compare versions side by side
Every saved change makes a new version of the job. Compare any two to see what moved, or roll back to an earlier one.
Several jobs at the same house each keep their own changes and history. They share one plan of the building and one map of its panels, so nothing gets drawn twice.
Once the work is done, that same job becomes your as-built record.
What it leaves to your other tools
- It doesn't send quotes or invoices or take payments. Add your quote number to the job so the paperwork lines up.
- Signatures happen on paper. There's no e-signature built in.
- It runs in a web browser on a tablet or laptop, not as a phone app.
One map, the whole job
- Panel mapping Link every breaker to the outlets and lights it feeds.
- Electrical floor plans Rooms, levels, and devices drawn to their real size.
- As-built records What you planned, what changed, and what got installed.
Get the next extra outlet in writing
The Free plan covers one person and up to 3 buildings. Pro is $39 a month for up to 3 people, unlimited buildings, and your logo on reports.
The first 50 companies on Pro pay half price for as long as they stay subscribed.